11 men can dig 634 m long trench in one day. How many men should be employed for digging 27 m long trench of the same type in one day ?
No. of men11xLength of the trench(m)27427
Since, no. of men and length of trench are inversely proportional, therefore,
⇒11x=27427
⇒x×274=27×11
⇒11×4=x
Thus, number of men required are 44.