The correct option is D 480
Let x be the new number for which the stock lasts 25 days.
Since the total stock remains same for both cases.
So, 1200×35=x×25
x=1200×3525=1680 men
Hence, additional men required is =1680−1200=480
Thus an additional 480 men should join the existing 1200 men to finish the stock in 25 days.