175 men can dig a canal 3150 m long in 36 days. How many men are required to dig a canal 3900 m long in 24 days?
325
No.of menLengthNo.of days175315036X390024
We'll define a new variable
Number of man days (N)
N=No. of men×No of days
N1=175×36=6300
N2=X×24=24X
Let length of the canal dug be L
Number of man days is directly proportional to the length of the canal dug.
N1N2=L1L2
⇒630024X=31503900
⇒X=390012=325