The correct option is A 6
Work rate of Man and Women,
(2/m) + (5/w) = 1/ (4 *3)..............(i)
(3/m) + (5/w) = 1/ (4 *2)............(ii)
(2) - (1)
1/m = 1/24
m = 24
It means one man needs 24 days to complete the work so work completed in 4 days , we need
24/4 = 6 men.