The correct option is A 2 days
The number of boys (B) required to complete a work is directly proportional to the amount of work (W).
B∝ W...(1)
The number of boys (B) required to complete a work is inversely proportional to the number of days required to do the work (D).
B∝1D...(2)
Combining (1) and (2), we get,
B∝WD
Let k be the constant of variation.
So, B=kWD
⇒BDW=K(constant)
Let the number of days required to complete the same work by 75 boys be x days.
Hence, (25)(6)W =(75)(x)W
⇒150=75x
So,x=2 days