Q. What is the probable Maximum Precipitation (PMP)?
- Projected precipitation for a 100 year return period
- Maximum precipitation for all past recorded storms
- Upper limit of rainfall, which is justified climatologically
- Effective precipitable water
Q. The mean annual flood of a river is 600 m3/sec, and the standard deviation of annual flood time series is 150 m3/sec. The percent probability of a flood of magnitude 1000 m3/s occuring in the river atleast once in 5 years, will be
[Use Gumbel's method and assume the sample size to be very large]
[Use Gumbel's method and assume the sample size to be very large]
- 11.25%
- 16.67%
- 9.99%
- 8.78%
Q. By using Gumbel's method, the flood discharge with a return period of 500 years at a particular township neighbourhood was estimated as 18000 m3/s with a probable error of 2000 m3/s. What are the 95% confidence probability limits of the 500 year flood at the location?
(f(c) = 1.96 for 95% confidence probability)
(f(c) = 1.96 for 95% confidence probability)
- 16100 m3/s to 19900 m3/s
- 17050 m3/s to 18950 m3/s
- 14080 m3/s to 21920 m3/s
- 13600 m3/s to 22400 m3/s
Q. Match List-I (Floods) with List-II (Parameters) and select the correct answer using the codes given below the lists:
List-I
A. Standard Project Flood (SPF)
B. Maximum Probable Flood (MPF)
C. Design Flood
D. Maximum Flood
List-II
1. Includes catastrophic floods
2. Includes floods of severe conditions
3. Peak flow obtained from observed data
4. Flood of desired recurrence interval
List-I
A. Standard Project Flood (SPF)
B. Maximum Probable Flood (MPF)
C. Design Flood
D. Maximum Flood
List-II
1. Includes catastrophic floods
2. Includes floods of severe conditions
3. Peak flow obtained from observed data
4. Flood of desired recurrence interval
- A- 2, B - 1 , C - 4, D - 3
- A- 1, B - 2 , C - 3, D - 4
- A- 2, B - 1 , C - 3, D - 4
- A- 1, B - 2 , C - 4, D - 3
Q. The Gumbel's reduced variate for the flood having return period of 100 years is
- 4.6
- 1.0
- 2.3
- 8.6
Q. The design flood commonly adopted in India for barrages and minor dams is
- Probable maximum flood
- A flood of 50-100 years return period
- Peak flood
- Standard project flood or a 100-year flood. whichever is higher
Q. Which one of the following is a method of extending the length of record for a frequency curve at a station?
- Double Mass Curve Method
- The Station Year Method
- Thiessen method
- Isohyetal method
Q. An annual flood series contains 100 years of flood data. For a return period of 200 years, the Gumbel's reduced variate can be taken as __________ .
- 5.3
Q. Generally to estimate PMP, Pn=42.16D0.475 is used (where Pn= maximum depth of precipitation, D = duration). What are the units of Pn and D respectively in the equation?
- mm, sec
- cm, sec
- mm, hr
- cm, hr
Q. The extreme flood that is physically possible in a region from a severe-most combination, including rare combination of metrological and hydrological factors, is designated as the
- Design flood
- Standard project flood
- Probable maximum flood
- Flash flood
Q. The Standard Project Flood is
- derived from the probable maximum precipitation in the region
- derived from the severemost meteoro-logical conditions anywhere in the country
- the flood with return period of 1000 years
- the same as the probable maximum flood
Q. The standard project flood is
- Same as the probable maximum flood
- Same as the design flood
- Smaller than the probable maximum flood
- Larger than the probable maximum flood by a factor implying safety factor