Work Done on & by the Object
Trending Questions
Q. A string is used to pull a block of mass m vertically up by a distance h at a constant acceleration g4. The work done by the tension in the string is
- +34mgh
- −14mgh
- +54mgh
- +mgh
Q. A rigid body of mass m is moving on circular path of radius r & with a constant speed v, net force on body is F, then during half rotation work done by F is,
- F(2r)
- F(r√2)
- F(πr)
- zero
Q. Figure gives the acceleration of a 2.0 kg body as it moves from rest along x− axis, while a variable force acts on it from x=0 m to x=9 m.
The work done by the force on the body when it reaches x=4 m and x=7 m is
The work done by the force on the body when it reaches x=4 m and x=7 m is
- 21 J and 33 J respectively
- 21 J and 15 J respectively
- 42 J and 60 J respectively
- 42 J and 30 J respectively
Q. A force of 5 N, making an angle θ with the horizontal, acting on an object and displaces it by 0.4 m along the horizontal direction. If the work done by the force is 1 J, then the horizontal component of the force is
- 1.5 N
- 2.5 N
- 3.5 N
- 4.5 N
Q. Two change particles having +ve charge are held together at a certain distance. When they are released they start moving away from each other and gain 150 J of their KE. Determine the total work done by internal forces.
- −150 J
- +150 J
- Zero
- None
Q. A rigid body of mass m is moving on circular path of radius r & with a constant speed v, net force on body is F, then during half rotation work done by F is,
- F(2r)
- F(r√2)
- F(πr)
- zero
Q. In the figure as shown two blocks are connected by a string over a pulley.
Calculate the total work done by tension force on the system for 1 m distance covered.
Calculate the total work done by tension force on the system for 1 m distance covered.
- 803 N
- −803 N
- Zero
- None
Q. v−t graph of a particle moving along x axis is shown in figure. Mass of the particle = 4 kg. Work done by all the forces acting on particle between t=3 to t=6 is
- 12 J
- 24 J
- 8 J
- 32 J
Q. Two change particles having +ve charge are held together at a certain distance. When they are released they start moving away from each other and gain 150 J of their KE. Determine the total work done by internal forces.
- −150 J
- +150 J
- Zero
- None
Q. In the shown pulley-block system, strings are light. Pulleys are massless and smooth and system is released from rest. In 0.6 second, what is the work done by gravity on 20 kg and 10 kg block respectively ?
Take [g=10 m/s2]
Take [g=10 m/s2]
- 120 J;30 J
- 30 J;120 J
- 240 J;−60 J
- −240 J;60 J
Q. A block of mass m is kept on a platform which starts from rest with constant acceleration g2 upwards as shown in the figure. Work done by the normal reaction on the block in time t is:
- mg2t28
- 3mg2t28
- \N
- −mg2t28
Q. A body constrained to move along the z-axis of a co-ordinate system is subjected to a constant force →F=(−^i+2^j+3^k) N. What is the work done by the force in moving the body over a distance of 4 m along the z-axis?
- 6 J
- 8 J
- 16 J
- 12 J
Q. An object of mass m=5 kg is being pulled up a rough inclined plane which is at 45∘ to the horizontal. The object is moving at an acceleration of 2 m/s2 along the inclined plane. The coefficient of kinetic friction between the object and the plane is 0.2. Calculate the total work done in pulling the block by 0.5 m. (g=10 m/s2)
- 7 J
- 10 J
- 5 J
- Zero
Q. A block of mass 2 kg is being brought down by a string. If the block acquires a speed of 1 m/s in dropping down 25 cm, find the work done by the tension in the process.
- − 16 J
- 4 J
- −4 J
- −4.5 J
Q. A force F=−kx2(x≠0) acts on a particle in x−direction. Find the work done by this force in displacing the particle from x=+a to x=+2a. Here k is a positive constant.
- ka
- ka
- −k2a
- ka
Q. One end of a light rope is tied directly to the ceiling. A man of mass M initially at rest on the ground starts climbing the rope upto a height l. From the time he starts at rest on the ground to the time he is hanging at rest at a height l, how much work was done on the man by the rope?
- 0
- Mgl
- −Mgl
- It depends on how fast the man goes up.
Q. An object of mass m=5 kg is being pulled up a rough inclined plane which is at 45∘ to the horizontal. The object is pulled at a constant speed of 0.8 m/s by a force which acts parallel to the inclined plane. The coefficient of kinetic friction between the object and the plane is 0.2. Calculate the work done by the force in pulling the block by 0.5 m. (g=10 m/s2)
- 21.2 J
- 23.2 J
- Zero
- 17.68 J
Q. A 60 kg weight is dragged on a horizontal surface by a rope upto 2 m with constant speed. If the coefficient of friction is μ=0.5, the angle of rope with the surface is 60∘ and g=9.8 m/sec2, then work done by rope on the block is
- 294 J
- 315 J
- 588 J
- 197 J
Q. A position dependent force F=(x2−3) N acts on a small body of mass 2 kg and displaces it from x=0 to x=5 m. The work done is
- 110 J
- 803J
- 952J
- Zero
Q. A block of mass m is kept on a platform which starts from rest with constant acceleration g2 upwards as shown in the figure. Work done by the normal reaction on the block in time t is:
- mg2t28
- 3mg2t28
- \N
- −mg2t28