A 100 meter long train moving with constant speed of 90 km/h crosses a tunnel of 300 meter long. The time taken by the train to cross the tunnel completely is
Open in App
Solution
Speed of train =90 km/h and length of train =100m =0.1km
length of tunnel =300m=0.3km
Time taken to cross the tunnel completely =0.3km+0.1km90km/h