A 100 MVA synchronous generator operates at full load at a frequency of 50 Hz. The load is suddenly reduced to 50 MW. Due to time lag in governor system, the steam valve begins to close after 0.4 sec. The frequency at t = 0.4 sec is ______ Hz (Given H = 4 MJ/MVA)
  1. 51.23

Open in App
Solution

The correct option is A 51.23
G = 100 MVA
and H = 4 MJ/MVA
KE = GH = 400 MJ

Excess power input to the generator shaft before the steam valve begins to close
= 100 - 50 = 50 MW

Excess energy transferred to rotating parts in 0.4 sec
= 50 × 0.4 = 20 MJ

KE (speed)2(frequency)2

f2=f1×Total energy stored in 0.4 secEnergy stored at synchronous speed

f2=50×420400=51.23Hz

flag
Suggest Corrections
thumbs-up
1
similar_icon
Similar questions
View More
Join BYJU'S Learning Program
similar_icon
Related Videos
thumbnail
lock
Equal Area Criteria: Sudden Short Circuit on One of Parallel Lines
POWER SYSTEMS
Watch in App
Join BYJU'S Learning Program
CrossIcon