Question
A 2 hr - unit hydrograph has a base period of 6 hr. The base period of 8 hr unit hydrograph is
A
1
No worries! We‘ve got your back. Try BYJU‘S free classes today!
B
14
No worries! We‘ve got your back. Try BYJU‘S free classes today!
C
12
Right on! Give the BNAT exam to get a 100% scholarship for BYJUS courses
D
8
No worries! We‘ve got your back. Try BYJU‘S free classes today!
Open in App
Solution
The correct option is
C
12
Now since
∴
T
=
n
×
D
8
=
n
×
2
n = 4
∴
t
′
B
=
t
B
+
(
n
−
1
)
D
Here
t
B
=
6
h
r
n = 4
D = 2hr
t
′
B
=
6
+
(
4
−
1
)
×
2
= 12 hr
Suggest Corrections
2
Similar questions
Q.
A 3 hr unit hydrograph
U
1
of a catchment of area
235
k
m
2
is in the form of a triangle with peak discharge
30
m
3
/
s
.
Another 3 hr unit hydrograph
U
2
is also triangular in shape and has the same base width as
U
1
, but has a peak flow of
90
m
3
/
s
.
What is the catchment area of
U
2
?
Q.
The peak magnitude of a flood hydrograph during 4 hr study duration over a catchment is
300
m
3
/
s
. The total depth of rainfall is 6 cm, and the infiltration loss during the said 4 hr period is 2 cm. A constant uniform base flow of
20
m
3
/
s
is premised throughout. The peak value of the corresponding 4 hr unit hydrograph is
Q.
Inflow and outflow hydrograph of a channel reach are triangular in shape and plotted simultaneously as shown. The peak of inflow hydrograph is 10,000
m
3
/
h
r
, base time 96 hr and peak occurs 1 hr after the start, Peak of outflow hydrograph is 8000
m
3
/
h
r
and occurs on the recession limb of outflow hydrograph. The value of maximum storage and time at which it occurs is :
Q.
If the base period of 6-hour hydrograph of a basin is 84 hours, then a 12-hour unit hydrograph derived from this 6-hour unit hydrograph will have a base period of
Q.
If the base period of a 6-hour hydrograph of a basin is 84 hours, then a 12 hours unit hydrograph derived from this 6 hour unit hydrograph will have a base period of
View More
Join BYJU'S Learning Program
Grade/Exam
1st Grade
2nd Grade
3rd Grade
4th Grade
5th Grade
6th grade
7th grade
8th Grade
9th Grade
10th Grade
11th Grade
12th Grade
Submit
Related Videos
Method of Superposition
HYDROLOGY & IRRIGATION
Watch in App
Explore more
Method of Superposition
Other Hydrology & Irrigation
Join BYJU'S Learning Program
Grade/Exam
1st Grade
2nd Grade
3rd Grade
4th Grade
5th Grade
6th grade
7th grade
8th Grade
9th Grade
10th Grade
11th Grade
12th Grade
Submit
AI Tutor
Textbooks
Question Papers
Install app