Work done by A and B in 1 day =112
Work done by B and C in 1 day =115
Work done by C and A in 1 day =120
Work done by (A+B)+(B+C)+(C+A) in 1 day =112+115+120
Work done by (2A+2B+2C) in 1 day =5+4+360
Work done by 2(A+B+C) in 1 day =1260
Work done by A, B and C together in 1 day =12×1260=110
∴ A, B and C will finish the work in 10 days.
Work done by A in 1 day
(i.e.) [(A+B+C)′swork−(B+C)′swork]=110−115=3−230=130
∴ A will finish the work in 30 days.
Work done by B in 1 day
(i.e.) [(A+B+C)′swork−(C+A)′swork]=110−120=2−120=120
∴ B will finish the work in 20 days.
Work done by C in 1 day
(i.e.) [(A+B+C)′swork−(A+B)′swork]=110−112=6−560=160
∴ C will finish the work in 60 days.