The correct option is A 18 days
2(A+B+C)'s 1 day's work =(130+124+120)=15120=18.
Therefore, (A+B+C)'s 1 day's work =12×8=16.
Work done by A,B,C in 10 days =1016=58
Remaining work =(1−58)=38.
A's 1 day's work =(116−124)=148.
Now, 18 work done by A in 1 day.
So, 38 work will be done by A in (48×38)=18 days.