A and B can do a piece of work in 6 days and 4 days respectively. ′A′ started the work; worked at it for 2 days and then was joined by B. Find the total time taken to complete the work.
A′s 1 day work
B′s 1 day work =14
A and day work =16+14=16
=2+312=512
A′s 2 day work =16×2=13
Remaining work =1−13=23 [∵ whole work =1]
Now A and B can do 512th work in 1 day
They will do 1 work (Whole work) in 1×125 daysB′s
and they will do 23th1 work =125×23
=85=135 days
∴ Total work was finished in =135+2
=335 days [∵abc+d=(a+d)bc]