The correct option is
A 120 days
In 10 days A and B does 1 work.
∴ In 1 day A and B will do 110 work -(i)
In 15 days B and C does 1 work
∴ In 1 day B and C will do 115 work -(ii)
In 20 days C and A does 1 work
∴ In 1 day C and A will do 120 work - (iii)
Adding equation(i),(ii)and (iii)
In1 day 2(A+B+C) will do(110+115+120)
In1 day 2(A+B+C) will do 1360
work.
In 1 day (A+B+C) will do13120 work
In 1 d a y(A+B)+(C) will do13120 work
A+B does 110 work in 1 day
∴ work done by C in 1 day
=13120−110
=1120
1120 work is done by C in 1 day.
∴1 work is done by C in 120 days.
Answer: option (A)