It is given that
A and B work together to do a piece of work in 10 days
B alone can do the same work in 15 days
So we get
A and B one day work = 110
B’s one day work = 115
A’s one day work = 110 – 115
Taking LCM
= (3−2)30
= 130
No. of days A can do the same work = 30 days