A and B working together can finish a piece of work in 6 days, while A alone can do it in 9 days. How much time will B alone take to finish it?
Open in App
Solution
We know that, Number of days A required to do a piece of work =9 days Let us consider number of days B required to do piece of work =X days Number of days required by A and B together to do a piece of work =6 days ∴ We can calculate, work done by A in 1 day =1/9 And the work done by B in 1 day =1/x Work done by both A and B in a day =1/6 Work done by both A and B together in 1 day =1/9+1/x=(x+9)/9x