A big iron boiler tank has a cylindrical structure which is open from the top. Its height is 10 m and radius is 7 m. It gets painted at a rate of 3 m2 per day. Then find the number of days in which the tank gets painted completely? (Take π=227)
198
Given, radius of the boiler = 7 m
Height of the boiler = 10 m
Since the iron boiler tank is opened on top,
Total surface area of the boiler = Curved surface area + Base area
=2πrh+πr2
=2×227×7×10+227×72
=440+154
=594 m2
∴ Total number of days in which the tank gets painted completely
=Total Surface area of tankArea painted per day
=594 m23 m2/day=198 days