wiz-icon
MyQuestionIcon
MyQuestionIcon
1
You visited us 1 times! Enjoying our articles? Unlock Full Access!
Question

A big iron boiler tank has a cylindrical structure which is open from the top. Its height is 10 m and radius is 7 m. It gets painted at a rate of 3 m2 per day. Then find the number of days in which the tank gets painted completely? (Take π=227)
[3 Marks]

Open in App
Solution

Given, radius of the boiler = 7 m
Height of the boiler = 10 m

Since the iron boiler tank is opened on top,
Total surface area of the boiler = Curved surface area + Base area
=2πrh+πr2
[1 Mark]
=2×227×7×10+227×72
=440+154
=594 m2
[1 Mark]

Total number of days in which the tank gets painted completely
=Total Surface area of tankArea painted per day
=594 m23 m2/day=198 days
[1 Mark]


flag
Suggest Corrections
thumbs-up
0
Join BYJU'S Learning Program
similar_icon
Related Videos
thumbnail
lock
Surface Area of Solids
MATHEMATICS
Watch in App
Join BYJU'S Learning Program
CrossIcon