A boy pulls up a bucket of water from a well deep. If the mass of the bucket along with water is , the amount of work done by the boy is:
[Take ]
Step 1: Given data
Given that,
Vertical height,
Mass of bucket along with water,
Acceleration due to gravity,
Work done, (to be calculated)
Step 2: Calculating the force required to lift the water
Forcemassacceleration due to gravity
Step 3: Calculating the work done
Work doneForceDisplacement
Hence, the correct answer is option (C) i.e. .