Question

A boy pulls up a bucket of water from a well 80m deep. If the mass of the bucket, along with water is 20kg, calculate the amount of work done by the boy. [Take g=10m/s2]


Open in App
Solution

Step 1: Given data

Mass of bucket with water, m=20kg

Depth of well i.e. vertical height, s=80m

Acceleration due to gravity, g=10m/s2

Work done, W=? (To be calculated)

Step 2: Calculating the force required to lift the water

Applying, F=m×g

By putting the given values in a formula, we get

F=20kg×10m/s2F=200N

Step 3: Calculating the work done

Applying, Workdone(W)=force(F)×displacement(s)

By putting the given values in a formula, we get

W=F×sW=200N×80mW=16,000J

Hence, work done by the boy is 16,000J


flag
Suggest Corrections
thumbs-up
0
Join BYJU'S Learning Program
similar_icon
Related Videos
thumbnail
lock
Work
PHYSICS
Watch in App
Join BYJU'S Learning Program
CrossIcon