Work done by both the person will be the same because the weight of the water and the height is same.
We know that,
1litre=10−3m3
20litre=20×10−3m3
Mass of the water is,
m=V×ρ
=20×10−3×1000
=20kg
The amount of work done is,
W=mg×h
=20×9.8×20
=3.92kJ