A can do a piece of work in 20 days whereas A and B can do the same in 4 days. If A has (x+10)% efficiency of B, then find x.
15
Work done by A in one day = 120
Let the time taken by B to complete the work be x days
120+1x=14
x = 5
So, A has 25% efficiency of B.