A can do13 of work in 5 days and B can do 25 of the work in 10 days.In how many days can both A and B together do the work?
A can do 2/3 of work in 16 days and B can do 1/4 of the same work in 3 days In how many can both finsh the work working together
A can do 12 of a work in 5 days. B can do 35 of the same work in 9 days and C can do 23 of that work in 8 days. In how many days can three of them together do the work?