A can do 12 of a work in 5 days. B can do 35 of the same work in 9 days and C can do 23 of that work in 8 days. In
A can do the entire work in 10 days.
B can do the entire work in 9×53 days, which is, 15 days.
C can do the entire work in 8×32 days, which is, 12 days.
∴(A+B+C)′s amount of work done in one day
=110+115+112=6+4+460=1560=14
∴ A, B and C together will complete the work in 4 days.