A can finish a work in 24 days, B in 9 days and C in 12 days. B and C together start the work but are forced to leave after 3 days.
What was the time taken by A to finish the remaining work alone?
10 days
(B+C)’s 1 day’s work =(19+112)=736
Work done by B and C in 3 days =(736×3)=712
Remaining work = (1−712)=512
Now, 112 work is done by A in 1 day.
So, 512 work is done by A in (24×512)=10 days