A cart of weight 10 N is pulled 1.2 m up a ramp. Force of 5 N is applied parallel to the ramp. The cart was raised 0.5 m above its initial level. Calculate the percentage efficiency of the work.
83.33%
Given:
Weight of the cart = 10 N
Vertical height = 0.5 m
Energy output = Potential energy
PE=m×g×h=10×0.5=5 J
Energy input = Work done to move the cart
=Force×displacement
=5×1.2=6 J
Percentage efficiency =Energy outputEnergy input = 56 ×100
= 83.33 %