A cement concrete pavement has thickness of 25 cm and of two lanes with a longitudinal joint along the centre. if the coefficient of friction (f) is 1.5 then the area of steel required per meter is
Given, h=25 cm,w=3.5m/lane
As=bfhγ100σs=3.5×1.5×2400×25100×1400=2.25cm2/m