A city is going to install the rapid sand filter after the sedimentation tank. Use the following data:
Design loading rate to the filter = 200 m3/m2/d ;
Design now rate = 0.5 m3/s
Surface area per filter box = 50 m2
The number of filters required shall be

A
4
No worries! We‘ve got your back. Try BYJU‘S free classes today!
B
6
Right on! Give the BNAT exam to get a 100% scholarship for BYJUS courses
C
8
No worries! We‘ve got your back. Try BYJU‘S free classes today!
D
3
No worries! We‘ve got your back. Try BYJU‘S free classes today!
Open in App
Solution

The correct option is B 6
Surface area required

=Design flow rateloading rate

=0.5×86400 m3/d200 m/d

=216 m2

Number of filter required

=Surface area requiredSurface area per filter=21650

= 4.32
= 5 filters

One additional filter is provided so that maintainance of filter should be carried without providing any overloading on any filter so, number of filters = 5+1= 6 filters.

flag
Suggest Corrections
thumbs-up
0
Join BYJU'S Learning Program
similar_icon
Related Videos
thumbnail
lock
Pressure Due to Liquid Column
PHYSICS
Watch in App
Join BYJU'S Learning Program
CrossIcon