A cuboidal casting of 30000 cm3 total volume has to be filled with a parting gating system as shown in the figure.


The highest of mould cavity above and below the runner plane are equal. The total liquid head is maintained constant such that it is equal to the mould height above the runner plane. If the runner has uniform cross-section of 20 mm diameter, the total time for filling (in seconds) the cavity will be ________ .

A
66
No worries! We‘ve got your back. Try BYJU‘S free classes today!
B
59
Right on! Give the BNAT exam to get a 100% scholarship for BYJUS courses
C
44
No worries! We‘ve got your back. Try BYJU‘S free classes today!
D
75
No worries! We‘ve got your back. Try BYJU‘S free classes today!
Open in App
Solution

The correct option is B 59

For cavity (1), the gating system acts as a top gating system.

So, τ1=15000×103π4×202×2×9810×300

= 19.68 sec

For cavity (2), the gating system acts as a bottom gating system.
Since the top surface coincides with free surface of molten metal, the time taken will be twice as compared to the time taken in top gating system.

τ2=2τ1=2×19.68=39.36 sec

Total time, τ=τ1+τ2

= 19.68 + 39.36 = 59.04 sec

flag
Suggest Corrections
thumbs-up
1
Join BYJU'S Learning Program
similar_icon
Related Videos
thumbnail
lock
A Spacious Measure
MATHEMATICS
Watch in App
Join BYJU'S Learning Program
CrossIcon