A dam is to be constructed on a sandy soil which has coefficient of permeability 10×10−4cm/sec in horizontal direction 2.5×10−4cm/sec in vertical direction. The dam is expected to impound 7.5 m of water. Flow net drawn on transformed section yields flow channels as '6' and drops are 15 only. The seepage loss per metre length of dam if water on downstream is 0.5 m