A does 45 of a work in 20 days. He then calls in B and they together finish the remaining work in 3 days. How long B alone would take to do the whole work?
days
Whole work is done by A in (20×54)=25 days
Now,(1−45) i.e. 15 work is done by A and B in 3 days.
Whole work will be done by A and B in (3×5) = 15 days.
Let B can complete the work in x days.
125+1x=130
x=752
=37.5 days