Question

A film of water is formed between two straight parallel wires each 10 cm long and at separation 0.5 cm. Calculate the work required to increase 1 mm distance between the wires. Surface tension of water=72×103 N/m.

A
144×107J
Right on! Give the BNAT exam to get a 100% scholarship for BYJUS courses
B
104×107 J
No worries! We‘ve got your back. Try BYJU‘S free classes today!
C
72×107 J
No worries! We‘ve got your back. Try BYJU‘S free classes today!
D
288×107 J
No worries! We‘ve got your back. Try BYJU‘S free classes today!
Open in App
Solution

The correct option is A 144×107J
Given:
As film has two layer.
Initial surface area=2×(length of wires × separation between them)
=2×10 cm×0.5 cm
=10×104 m2
Final surface area=2×(length of wires × separation between them)
=2×10 cm×(0.5+0.1) cm
=12×104 m2

The required work,
W=TΔA
=72×103×(12×10410×104) J
=144×107 J