wiz-icon
MyQuestionIcon
MyQuestionIcon
1
You visited us 1 times! Enjoying our articles? Unlock Full Access!
Question

A firm produces an alloy having the following specifications:
(i) specific gravity0.98
(ii)chromium8percent
(iii)melting point4500C
Raw materials A,B and C having the properties shown in the table can be used to make the alloy.
PropertyProperty of raw
material A
Property of raw
material B
Property of raw
material C
Specific gravity0.920.971.04
Chromium7 percent13 percent16 percent
Melting point4400 Celsius4900 Celsius4800 Celsius
Costs of the various raw materials per ton are:Rs.90 for A,Rs.280 for B and Rs.40 for C. Formulate the L.P model to find the proportions in which A,B and C be used to obtain an alloy of desired properties while the cost of raw materials is minimum.

Open in App
Solution

Formulation of Linear Programming Model:
Let the proportions of raw materials A,B and C to be used for making the alloy be x1,x2 and x3 respectively.
Objective is to minimize the cost
i.e., minimize Z=90x1+280x2+40x3
Constraints are imposed by the specifications required for the alloy.
They are
0.92x1+0.97x2+1.04x30.98,
7x1+13x2+16x38,
440x1+490x2+480x3450,
and x1+x2+x3=1,
as x1,x2 and x3 are the proportions of materials A,B and C in making the alloy.
Also, x1,x2,x3, each 0

flag
Suggest Corrections
thumbs-up
0
Join BYJU'S Learning Program
similar_icon
Related Videos
thumbnail
lock
Graphical Method of Solving LPP
MATHEMATICS
Watch in App
Join BYJU'S Learning Program
CrossIcon