A frontend loader applied 150 N of force to lift a stone,1250 joules of work was done. How far was the rock lifted?
9.3 m
10.3 m
8.3 m
5.3 m
Work done = Force × displacement
1250 = 150 × displacement
Displacement = 1250150 = 8.33 m
A frontend loader did 1250 joules of work to lift a rock by applying 150 N force. How far was the rock lifted?
A front end loader applied a force of 150 N to move a rock such that 1250 J of work is done. How far is the rock moved?
A frontend loader applied 150 N of force to lift a stone. If a work of 1250 joules was done in total, then what is the distance moved by the stone?
A front end loader applied 150 N of force to lift a stone and 1250 joules of work was done. How high was the rock lifted?