A group of a 16 piles (4 in each row) was installed in a clay deposit shown below. The diameter of each pile is 0.5m and clear spacing between the pile is 0.5 m. The depth of the pile group is 18m.

Group efficiency of pile group will be




A
60%
No worries! We‘ve got your back. Try BYJU‘S free classes today!
B
75%
No worries! We‘ve got your back. Try BYJU‘S free classes today!
C
90%
No worries! We‘ve got your back. Try BYJU‘S free classes today!
D
92.8%
Right on! Give the BNAT exam to get a 100% scholarship for BYJUS courses
Open in App
Solution

The correct option is D 92.8%
Qu(g)1=qp×Ag+α×Pg×D

=9×25×(3.5×3.5)+1×25×(4×3.5)×18

Qu(g)1=9056.25 kN

Qu=9×25×π4(0.5)2+0.8×25×(π×0.5)×18

Qu=44.15+565.2

Qu=609.35kN

For 16 piles

Qu(g)2=9754.64 kN

Safe Load = Lesser of Qu(g)1 and Qu(g)2F.O.S.

Safe Load = 9056.252.5

= 3622.5 kN

Group efficiency

ηg=Qu(g)1Qu(g)2=9056.259754.64

ηg=92.8%

flag
Suggest Corrections
thumbs-up
2
Join BYJU'S Learning Program
similar_icon
Related Videos
thumbnail
lock
Group Pile in Clay
FOUNDATION ENGINEERING
Watch in App
Join BYJU'S Learning Program
CrossIcon