A labourer is required to make 100 units in a day but actually, he is able to make 80 units in a day. Thus, there is a negative deviation of 20 units.
(i) What steps should be taken to reduce the deviation?
(ii) Which values are missing in the above paragraph?
(i) The company can use the better control system causes under controlling, the actual work done is compared with the standard work and if there are deviations then corrective measures can be adopted to bring the work on the track.
(ii) Labour is careless and irresponsible. Here, values like loyalty, respect for work and discipline are missing.