A launching apron is to be designed at the downstream side of a weir. The structure is designed for a discharge of 8.2 m3/sec/m. What should be the length of the apron if the tail water depth is 3m? (Assume, the scour depth is taken as double as that of Lacey's scour depth, where the silt factor is 1.01)