A man, a woman and a boy can complete a job in 3, 4 and 12 days respectively. How many boys must assist 1 man and 1 woman to complete the job in 14 of a day?
41
(1 man + 1 woman)’s 1 day’s work =(13+14)=712
Work done by 1 man and 1 woman in 14 day=(712×14)=748
Remaining work = (1−748)=4148
Work done by 1 boy in 14 day= (112×14)=148
∴ Number of boys required = (4148×48)=41