Question
A manufacturer produces nuts and bolts. It takes 1 hour of work on machine A and 3 hours of work on machine B to produce a package of nuts. It takes 3 hours on machine A and 1 hour on machine B to produce a package of bolts. He earns a profit of Rs 17.50 per package on nuts and Rs 7.00 per package on bolts.Then number of packages that can be produced to maximize his profits, if he operates each machine for at most 12 hours a day, is