Let the mixture be 100
Quantity of sand in the mixture = 50011%
Quantity of gravel in the mixture = 40011%
Quantity of Cement in the mixture =100 50011%−40011%
⇒1100÷500−40011%
⇒20011%
Let xKg of mixture contain 12.5Kg of sand
But 100 of mixture contains 50011% of sand
⇒x100%=12.550011%
⇒x=12.5×100%500%×11Kg
=2.5×11kg
=27.5Kg
let yKg of mixture contain 4Kg of cement
But 100 of mixture contain 20011% discount
⇒y100%=420011%
y=22Kg