A parabolic vertical curve is set out connecting a + 0.7% grade to a -0.6% grade. The chainage and RL of the point of intersection are 1000 m and 250 m respectively. The admissible rate of change of grade is 0.05% per 20 m. The chainage (in m) of the tangent points will be