Question
A small firm manufactures gold rings and chains.The total number of rings and chains manufactured per day is almost 24. It takes 1 h to make a ring and 30 min to make a chain. The maximum number of hours available per day is 16. If the profit on a ring is Rs.300 and that on a chain is Rs.190, then find the number of rings and chains that then find the number of rings and chains that should be manufactured per day so as to earn the maximum profit. Make it as an LPP and solve it graphically.