A surface water treatment plant operates round the clock with a flow rate of
35 m3/min . The water temperature is
15∘C and jar testing indicated an alum dosage of
25 mg/l ;
Gt=4×104 for producing optimum result. The alum required for 30 days (in kg) is -
- 37800