A train is scheduled to run from Delhi to Pune at an average speed of 80 km/h but due to repairs of track , it looses 2 hrs in the first part of the journey. It then accelerates at a rate of 20 km/h2 till the speed reaches 100 km/h. This speed is now maintained till the end of the journey. If the train now reaches station on time, then find the distance from pune to a point when it starts accelerating.