A worker lifts a 20.0kg bucket of concrete from the ground up to the top of a 20.0m tall building. What is the amount of work that the worker did in lifting the bucket?
Given:
The mass of the bucket m=20 kg
The height of the building h=20 m
Work done by the worker=Potential energy of bucket at the top of the building
∴W=mgh
⇒W=20×9.8×20
⇒W=3920J
Thus, the required work done is 3.92kJ