The correct option is D Ropar and Harike
Ropar and Harike Headworks are built on the Sutlej river. The Ropar Headworks, which was constructed in the year 1874-82 for the supply of Sutlej waters to Punjab areas through old Sirhind Canal System, was remodeled in 1952-54 for utilization of waters stored by Bhakra Dam. Harike Headwork was constructed in the year 1954-55, deep inside the Indian Territory.