Arrange the processes in the increasing order of their maximum material removal rate.
Electrochemical Machining (USM)
Electron Beam Machining (EBM)
Laser Beam Machining (LBM)
Electric Discharge MAchining (EDM)
Process | Maximum metal removal rate |
1. ECM | 10×103m3/min |
2. USM | 180mm3/min |
3. EBM | 10mm3/min |
4. LBM | 5mm3/min |
5. EDM | 5×103mm3/min |