At a construction site, a contractor plans to make an excavation as shown in the figure.
The water level in the adjacent river is at an elevation of + 20.0 m. Unit weight of water is 10 KN/
m3. The factor of safety (upto decimal places) against sand boiling for the proposed excavation is
- 1