Question

At a small water treatment plant which has 4 filters, the rate of filtration and backwashing are 200 m3/d/m2 and 1000 m3/d/m2, respectively. Backwashing is done for 15 min per day. The maturation, which occurs initially as the filter is put back into service after cleaning, takes 30 min. It is proposed to recover the water being wasted during backwashing and maturation. The percentage increase in the filtered water produced (up to two decimal places) would be
  1. 7.53

Open in App
Solution

The correct option is A 7.53
Rate of filteration = 200 m3/d/m2
Backwashing rate = 1000 m3/d/m2
Time for backwashing = 15 min/day
Time wasted in maturation = 30min
Let the area of filter be unity

Total water to be produced

=200m3/d/m2×23.2524=193.75

The water wasted in backwashing

1000×1524×60=10.4167 m3

The water wasted during maturation

=200×3024×60

=4.1667 m3


Total filter water to be produced

=193.75+10.4167+4.1667

=208.3334 m3

Hence percentage increase in filtered water produced

=208.3334193.75193.75

=7.53%

flag
Suggest Corrections
thumbs-up
5
similar_icon
Similar questions
View More
Join BYJU'S Learning Program
similar_icon
Related Videos
thumbnail
lock
Solid Waste Management
BIOLOGY
Watch in App
Join BYJU'S Learning Program
CrossIcon