At a small water treatment plant which has 4 filters, the rate of filtration and backwashing are
200 m3/d/m2 and
1000 m3/d/m2, respectively. Backwashing is done for 15 min per day. The maturation, which occurs initially as the filter is put back into service after cleaning, takes 30 min. It is proposed to recover the water being wasted during backwashing and maturation. The percentage increase in the filtered water produced (up to two decimal places) would be
- 7.53