At the beginning of a month, a factory has enough materials to make 240 tonnes of steel in a month. If 60 more tonnes of steel is to be made that month, how long will the materials last?
Open in App
Solution
In 30 days steel manufactured =240 tonnes
Now, 60 more tonnes of steel is to be manufactured in that month.
So,
240+60=300 Tonnes of steel to be manufactured in the month.
Therefore,
More steel manufactured, fewer days the material will last.